Plenty of contractors finish a year with full calendars and an empty bank account. The work was there. The profit wasn’t. Usually a few jobs quietly lost money and nobody noticed until the accountant did.
Job costing fixes that. It means tracking what every job actually cost you, line by line, so you can see which jobs make money and which ones eat it.
Busy isn’t the same as profitable
Your bank balance tells you how the whole business is doing. It doesn’t tell you that the basement reno made 30% while the deck you squeezed in lost $1,800. Without job-level numbers, you keep quoting the deck the same way and keep losing on it.
What to track on every job
Keep it simple. Every cost you can tie to one job goes against that job:
- Labour. Hours for every person on site, including travel and cleanup.
- Materials. Everything bought for the job, including the second trip to the supplier.
- Subcontractors. Every sub invoice, matched to the job it was for.
- Equipment and rentals. Dumpsters, lifts, and the tools you rented for two days.
- Permits and fees. Permits, inspections, disposal and delivery charges.
Office rent, insurance, your truck payment and software are overhead. They matter, but they belong in your pricing, not in a single job’s costs.
Load your labour properly
The most common job costing mistake is using a worker’s hourly wage as their cost. A $30/hour carpenter costs you more than $30 an hour once you add vacation pay, CPP and EI contributions, workers’ comp premiums and any benefits. Depending on your province and trade, that burden often adds 20% to 35% on top of the wage.
$30 wage + 28% burden = $38.40 an hour. On a 120-hour job, that’s $1,008 you’d have missed by costing at the wage.
Estimate vs actual, every week
Job costing pays off when you compare what you estimated to what you spent while the job is still running. If labour is at 70% of the estimate and the job is half done, you know now, not after the final invoice. You can talk to the customer about a change order, tighten up the schedule, or at least learn for the next quote.
After the job, look at the gap in each category. Consistently over on labour? Your production rates are too optimistic. Over on materials? You may be underestimating waste or not charging for small extras.
Make it a habit, not a project
Job costing fails when it depends on someone typing in receipts on Sunday night. The fix is capturing costs as they happen: crew clock in and out against a job, receipts are snapped on the spot, and mileage logs itself. Contruva does this for you, so every job shows what it cost and what it earned without a spreadsheet.
