All free toolsFree toolFree calculator · Updated November 2026

A free gravel calculatorin yards and tonnesfor stone, sand, soil and mulch.

Enter the area and depth and get cubic yards, cubic metres, tons, tonnes and bags, with a compaction allowance and your supplier’s price. Imperial or metric.

A gravel calculator turns the length, width and depth of an area into the amount of stone to order. Contruva’s free gravel calculator gives you cubic yards, cubic metres, US tons and metric tonnes in one go, plus the number of bags and a delivered cost if you enter your supplier’s price. It works for crushed stone, pea gravel, river rock, sand, topsoil and mulch.

Use the free tool

Open the free gravel calculator in your browser. No login, no email, nothing to pay.

Open the free tool

The math is simple: area × depth = volume, then volume × weight per yard = tons. Where people go wrong is mixing feet and inches, forgetting compaction, and comparing a per-tonne price with a per-yard price. This page walks through the formula, three worked examples you can check by hand, typical weights, and how Canadian yards quote bulk material.

How to use the gravel calculator

Step 1
Pick the shape and units.

Rectangle, circle or triangle, in feet and inches or metres and centimetres.

Step 2
Choose the material.

Crushed stone, pea gravel, river rock, sand, topsoil or mulch. Each one fills in a typical weight per yard (or per cubic metre) and a starting compaction allowance. Change either to match your supplier.

Step 3
Enter the size and depth.

Length and width, the diameter of a circle, or the base and height of a triangle. Depth goes in inches or centimetres.

Step 4
Add the bag size and price.

Optional. Enter the bag size printed on the product, your supplier’s price per ton, tonne, yard or cubic metre, and the delivery fee.

Step 5
Read the order.

Cubic yards or cubic metres up top, then tons and tonnes, bags, and the delivered cost before tax.

Mulch is different

Mulch is sold by volume, not weight, so the calculator hides tons for mulch and gives you yards, cubic metres and bags only.

How to calculate gravel by hand

Every gravel calculation is the same four steps. The only trick is converting the depth to the same unit as the length and width before you multiply.

StepImperialMetric
AreaLength (ft) × width (ft) = sq ftLength (m) × width (m) = m²
VolumeArea × depth (in) ÷ 12 = cu ftArea × depth (cm) ÷ 100 = m³
Add allowance× (1 + compaction %)× (1 + compaction %)
To order unitscu ft ÷ 27 = cu ydAlready in m³
Weightcu yd × tons per yard = tonsm³ × tonnes per m³ = tonnes

For a circle, the area is π × (diameter ÷ 2)². For a triangle, it’s base × height ÷ 2, with the height measured square to the base. Odd shapes are easiest to split into rectangles, circles and triangles, then add the volumes.

Worked examples

Crushed stone pad, imperial

A 12 × 30 ft parking pad, 6 inches of crushed stone, with a 15% allowance for compaction.

Area
360 sq ft.

12 × 30 = 360.

Volume
180 cu ft.

360 × 6 ÷ 12 = 180 cu ft.

Allowance
207 cu ft.

180 × 1.15 = 207 cu ft, which is 7.67 cu yd or 5.86 m³.

Weight
10.73 tons.

7.67 × 1.4 tons per yard = 10.73 US tons, or 9.74 metric tonnes.

Bags
430 bags.

Bagged, that’s 21,467 lb ÷ 50 lb = 429.3, so 430 bags. Nobody bags a driveway, but the number makes the case for bulk delivery.

If your supplier charges $40 a ton and $150 to deliver, the calculator shows $429.33 for stone and $579.33 delivered, before tax. If they quote $60 a yard instead, the stone is $460. Those prices are only for the example; use the ones on your supplier’s sheet.

Mulch ring around a tree

An 8 ft circle of mulch, 3 inches deep, with 10% extra.

Result

Area 50.27 sq ft · × 3 ÷ 12 = 12.57 cu ft · × 1.10 = 13.82 cu ft, or 0.51 cu yd · ÷ 2 cu ft per bag = 6.9, so 7 bags.

Pea gravel walkway, metric

A 1.2 × 10 m walkway, 10 cm of pea gravel at 1.72 tonnes per m³, with 5% extra.

Volume
1.2 m³.

1.2 × 10 × 0.10 = 1.2 m³.

Allowance
1.26 m³.

1.2 × 1.05 = 1.26 m³, which is 1.65 cu yd.

Weight
2.17 tonnes.

1.26 × 1.72 = 2.17 tonnes (2.39 US tons).

Bags
87 bags of 25 kg.

2,167 kg ÷ 25 = 86.7, so 87.

Cost
$250.03 delivered.

At an example $60 a tonne plus $120 delivery.

How much does a yard of gravel weigh?

It depends on the stone, the gradation and how wet the load is. Crushed stone with fines packs tighter than washed, single-size stone, and a load that sat in the rain weighs more on the scale. These are the starting figures the calculator uses. Every one is editable, and your supplier’s number beats ours.

MaterialTons per cu ydTonnes per m³Usually sold
Crushed stone / gravel1.41.66By the tonne or yard
Pea gravel1.451.72By the tonne or yard, or bagged
River rock1.351.60By the tonne or bagged
Sand1.31.54By the tonne or yard, or bagged
Topsoil1.11.31By the yard or in bags by volume
Mulchn/an/aBy the yard or in bags by volume

Published figures vary. Inch Calculator lists crushed stone at roughly 1.4 to 1.7 tons per cubic yard, and Canada Brick’s rule-of-thumb sheet uses 1.25 tons per yard for sand (both checked November 2026). That spread is why the weight field is editable. If your supplier prints a conversion on their price sheet or scale ticket, use it.

Yards vs tonnes: how suppliers sell it

Canadian aggregate yards don’t all quote the same way. Some price stone by the metric tonne because it goes over a scale, some by the cubic yard because it goes in a loader bucket, and many list both. An Ottawa-area supplier’s 2026 price sheet, for example, shows its pea stone and sands at a per-tonne and a per-yard price side by side. Landscape depots and garden centres usually sell topsoil, mulch and triple mix by the yard.

ConversionValue
1 cubic yard27 cu ft, or 0.765 m³
1 cubic metre35.31 cu ft, or 1.308 cu yd
1 US (short) ton2,000 lb, or 0.907 tonnes
1 metric tonne1,000 kg, or 1.102 US tons

Watch the word “ton”. In Canada a quote in tons usually means metric tonnes, which are about 10% heavier than the US short ton you’ll see on American calculators and data sheets. The gravel calculator shows both so you can match the unit on the quote. To compare a per-tonne price with a per-yard price, multiply the tonne price by the tonnes per yard: at 1.27 tonnes per yard (1.4 US tons), $40 a tonne is about $51 a yard.

How deep should gravel, soil and mulch be?

Depth drives the order more than anything else: going from 4 to 6 inches adds half again to the load. These are common starting points, not engineering specs. Clay, poor drainage and heavy vehicles all call for more.

UseTypical depthSource / note
Mulch beds2–3 in (5–8 cm)Mississippi State University Extension
Paver base, walkways and patios4–6 in (10–15 cm) compactedUnilock installation guide
Paver base, driveways8–12 in (20–30 cm) compactedUnilock installation guide
Paver bedding sand1 in (25 mm)ICPI and Unilock
Topsoil for a new lawnOften 4–6 in (10–15 cm)Common guidance; go deeper over clay
Gravel drivewayVaries with soil and trafficBuilt in layers: a compacted base, then a surface stone

For a gravel driveway, plan the base and the surface layer separately and run the calculator once for each, because they’re usually different stone at different prices. If you’re putting pavers on top, the paver calculator works out the base, bedding sand, polymeric sand and edging for you. Concrete slabs are covered in the construction material calculator.

Compaction, waste and rounding

Loose stone takes up more room in the truck than it does once it’s been run over with a plate compactor. If you order exactly the compacted volume, you’ll come up short. The calculator adds a percentage on top of the measured volume to cover that, plus spillage and uneven subgrade.

  • Crushed stone with fines (a road base or Granular A type product): starts at 15%, because it’s meant to be compacted hard.
  • Sand and topsoil: 10–15%. Topsoil settles after the first rain.
  • Pea gravel and river rock: 5%. Round, washed stone doesn’t pack down much.
  • Mulch: 10%. It settles and breaks down over a season.

Those are the calculator’s defaults, not a standard. If you know your stone and your compactor, change them. Then round up: suppliers deliver in whole or half yards or tonnes, often with a minimum load, and a short load usually costs more per tonne than a full one. A spare half yard on site is cheaper than a second delivery fee.

Measure the dig, not the drawing

If the excavation went deeper in the low spots, the gravel will follow it. Take depth readings in a few places and use the average, not the number on the plan.

From a load of stone to a quote

Once you know the tonnage, the material line on the quote is the stone, the delivery fee, and your markup. The labour side is excavation, spreading and compaction hours at your rate. The hourly rate calculator gives you that rate, and the markup calculator turns cost into price without confusing markup with margin.

If you run a landscaping or excavation crew, Contruva keeps stone, soil and mulch in a price catalog, so building a quote takes minutes and the customer can approve it and pay a deposit from their phone with online payments. Receipts and crew hours roll into job costing, so you can see whether the 10 tonnes you priced matched the 12 you actually bought. Everything is in one plan, Contruva Pro, at $249.99 CAD a month. Try it free for 7 days, no credit card needed.

01Questions

Straight answers.

Still unsure? Call us at +1 (647) 922-5436. A real person picks up.

Ask us anything

How do I calculate how much gravel I need?

Multiply length × width in feet, multiply by the depth in inches and divide by 12 to get cubic feet, then divide by 27 for cubic yards. A 12 × 30 ft area at 6 inches is 180 cu ft, or 6.67 cu yd before any compaction allowance.

How many tons are in a yard of gravel?

Most crushed stone and gravel weighs about 1.4 to 1.7 US tons per cubic yard, depending on the stone and how wet it is. Ask your supplier for their figure and enter it in the calculator.

Is a tonne the same as a ton?

No. A metric tonne is 1,000 kg, about 2,205 lb. A US short ton is 2,000 lb. Canadian suppliers usually mean metric tonnes.

How much extra gravel should I order for compaction?

Crushed stone that gets compacted needs more on top of the measured volume than washed stone that doesn’t. The calculator starts at 15% for crushed stone and 5% for pea gravel and river rock; adjust it to your material and site.

How many bags of mulch do I need?

Work out the volume in cubic feet and divide by the bag size. An 8 ft circle at 3 inches with 10% extra is 13.8 cu ft, which is seven 2 cu ft bags.

Does the gravel calculator work in metric?

Yes. Switch to metres and centimetres and it gives cubic metres and tonnes first, with cubic yards and US tons alongside, and bag counts in kilograms or litres.

Run it yourself.
Or text it.

Free for 7 days. No credit card. Every tool and Contruva AI included.