How much depositshould a contractorask for?

Enough to cover what you have to buy and commit before the job starts, and no more than the law allows where you work. Here are the typical ranges, the legal limits we found, and how to set your own policy.

How much deposit a contractor should ask for depends on the job and where you work. A common range is 10% to 30% of the contract price, or the cost of special-order materials on jobs that need them. But some places cap deposits by law: California limits home improvement down payments to $1,000 or 10%, whichever is less, and Ontario’s government recommends keeping them to 10%.

So check your local rules first, then size the deposit to cover your real up-front risk: materials you can’t return, permits, and the slot you hold on your schedule. The ranges below are typical market practice, not rules.

The short answer

SituationTypical depositWhy
Small repair or service callNone, paid on completionLittle risk, quick job, you collect same day
Small job, stock materials0% to 25%Covers materials and holds the date
Renovation, mostly labour10% to 30%Holds the slot and covers start-up costs
Special-order items (cabinets, windows, custom doors)The cost of those itemsYou can’t return them if the customer walks
Large or long project10% deposit plus progress paymentsKeeps payments matched to work done
Commercial workOften none; progress billingPaid on monthly or milestone invoices

Typical ranges based on common practice in the trades, not a legal standard. Where a law sets a cap, the law wins.

Typical deposit ranges by job

The deposit does three jobs: it pays for things you must commit to before the work starts, it holds a spot on your schedule, and it shows the customer is serious. Your number should reflect how much of each your job involves.

Trade / job (worked examples)Job sizeTypical depositMain driver
Handyman day$600NoneCollect on completion
Exterior painting$6,50010% to 25%Paint and holding the weather window
Deck build$18,00020% to 35%Lumber order
Kitchen renovation$45,00010% plus cabinet cost at orderingCustom cabinets and counters
Roof replacement$14,00015% to 30%Shingles and dumpster booked
Furnace replacement$7,80025% to 50%Equipment ordered for the job
Spring landscape install$9,50020% to 30%Plants, sod and stone ordered

These are illustrative ranges to show how the drivers change the number. Your market and your contract terms decide the final figure, and in the jurisdictions below the law sets a ceiling. For pricing the job itself, see how to price a contractor job, and for specific trades our guides on handyman pricing and bidding a painting job.

Where deposits are capped by law

We checked the official sources for the places contractors ask us about most (November 2026). Most provinces and states don’t set a general cap for renovation deposits, but some do, and the penalties can be serious.

JurisdictionRuleSource
CaliforniaHome improvement and swimming pool down payment can’t exceed $1,000 or 10% of the contract price, whichever is less, with no exception for special-order materials. Later payments can’t exceed the value of work performed.CSLB
MassachusettsOn residential contracts over $1,000, the deposit before work starts can’t exceed the greater of one-third of the contract price or the actual cost of special-order or custom materials.M.G.L. c.142A §2
OntarioNo hard cap found, but the province recommends deposits of no more than 10% of the total project cost and requires a written contract for jobs over $50.Ontario.ca
British ColumbiaConsumer Protection BC says the law limits down payments on direct (door-to-door) sales contracts to $100 or 10%, whichever is less; it does not set a general cap on other contract deposits.Consumer Protection BC
Other states and provincesSome other US states also limit deposits on home improvement work. Check your state or provincial consumer protection office and contractor licensing board.Your licensing board
California worked example

On a $40,000 bathroom remodel in California, 10% would be $4,000, so the cap is the lower figure: $1,000. On an $8,000 job, 10% is $800, so the cap is $800. Beyond that, you bill as work is done.

General information, not legal advice. Laws change; confirm with your licensing board or a lawyer before setting your deposit policy.

How to work out your deposit

Start from your real up-front exposure, then round to a clean number your customers understand.

Step 1
Check the legal cap.

If your jurisdiction sets one, that’s your ceiling. Everything below fits under it.

Step 2
Add up committed costs.

Special-order materials, non-refundable equipment orders, permit fees, dumpster or equipment bookings.

Step 3
Add a schedule hold.

A modest amount, often 5% to 10%, for the slot you turn other work away for.

Step 4
Compare to your standard range.

If the result is far above your usual 10% to 30%, consider a milestone payment when materials are ordered instead.

Step 5
Write it into the quote.

State the amount, when it’s due, what it covers, and how it’s credited on the final invoice.

Worked examples

Two jobs in Ontario, with HST at 13% added to each payment. Numbers are illustrative.

Kitchen renovation, $40,000 + HSTAmountDue
Deposit (10%, in line with Ontario’s guidance)$4,000 + HSTOn signing
Cabinet and counter order$14,000 + HSTWhen the order is placed
Rough-ins and drywall complete$10,000 + HSTAt milestone
Cabinets installed$8,000 + HSTAt milestone
Completion and walkthrough$4,000 + HSTOn completion
Total$40,000 + HST ($45,200)

Instead of asking for 45% on day one, this schedule keeps the signing deposit at 10% and collects the big materials payment when the cabinets are actually ordered. The customer is never paying far ahead of the work, and you never front the cabinet cost yourself.

Deck build, $12,000 + HSTAmountDue
Deposit to cover the lumber order$3,600 + HST (30%)On signing
Framing complete$4,800 + HSTAt milestone
Completion$3,600 + HSTOn completion
Total$12,000 + HST ($13,560)

In California, the same deck would start with a $1,000 down payment (10% of $12,000 is $1,200, so the $1,000 limit applies), with progress payments only as work is completed.

How to ask for a deposit

Customers expect a deposit on bigger jobs. What puts them off is a vague one. Say what it covers and when it’s credited.

In the quote

“A deposit of $3,600 (30%) is due on approval to order your lumber and book your start date. It’s credited in full on your final invoice.”

When they hesitate

“Totally fair question. The deposit covers the materials we order specifically for your job, and it locks in your start date of May 12. Everything else is paid as the work gets done, so you’re never paying far ahead of what you can see.”

By text after they say yes

“Great news, Dev. Here’s your quote to sign, with the deposit link on the same page: [link]. As soon as it’s in, we’ll order materials and confirm May 12.”

A big deposit with no explanation is also a red flag for homeowners who’ve read warnings about contractors who take money and disappear. Being clear and reasonable here helps you close, not just get paid.

Refunds, cancellations and cooling-off

Write what happens to the deposit if the customer cancels: what’s refundable, and what you keep for materials already bought. Then check it against consumer law. In Ontario, for example, a customer who signs a contract at their home has a 10-day cooling-off period to cancel without fees, and the contractor must refund within 15 days of the cancellation notice, according to the province’s renovation business guide. Many contractors wait out a cooling-off period before ordering special materials for that reason.

Also ask your accountant how sales tax applies to deposits in your province or state, so your invoice shows the deposit and the tax correctly.

Collecting it without the hassle

The deposit is easiest to collect at the moment the customer says yes. If they have to sign, then find your e-Transfer email, then remember to send it, you lose days and sometimes the job. Put the signature and the payment on the same screen.

  • State the deposit and payment schedule in the quote
  • Let the customer sign and pay by card in one step
  • Show the deposit as a credit on the final invoice
  • Don’t order special materials until it’s paid

That’s how Contruva quotes work: customers sign on their phone and pay the deposit in the same step, and the signed quote turns into a job and an invoice with the deposit already credited. Card payments run through Stripe and Contruva adds no fee of its own on top of standard processing. For the rest of the cash flow picture, read how to get paid faster as a contractor. See Contruva Pro, free for 7 days.

01Questions

Straight answers.

Still unsure? Call us at +1 (647) 922-5436. A real person picks up.

Ask us anything

What is a normal deposit for a contractor?

Typical practice is 10% to 30% of the contract price, or the cost of special-order materials, though some places cap it by law. California, for example, limits home improvement down payments to $1,000 or 10%, whichever is less.

Is it normal for a contractor to ask for 50% up front?

Some contractors ask for that on jobs heavy with special-order equipment, but it is high for most renovations and is not allowed in places with deposit caps. Splitting it into a smaller deposit plus a materials payment is usually easier to sell.

Is there a legal limit on contractor deposits in Canada?

We did not find a general statutory cap in Ontario or BC for renovation deposits, but Ontario’s government recommends no more than 10% of the total project cost. Check your province’s consumer protection office.

What is the maximum deposit a contractor can take in California?

For home improvement contracts, the CSLB says the down payment cannot exceed $1,000 or 10% of the contract price, whichever is less, with no exception for special-order materials.

Should a contractor deposit be refundable?

Your contract should say. Many contractors make the deposit refundable minus the cost of materials already ordered, and consumer laws such as Ontario’s 10-day cooling-off period for contracts signed at home can require a full refund.

When should a contractor ask for the deposit?

At signing, in the same step as the approval, and before ordering any special materials.