Learning how to price a deck build starts with one number: the cost per square foot installed, which in Ontario in 2026 runs about $45 to $95 a square foot depending on the material. A pressure-treated deck is the cheapest, a composite deck costs 40% to 60% more, and the extras, stairs, railings, footings and permits, are where most estimates go wrong. The method below prices each part separately, so the quote is right even when the deck is not a simple rectangle.
Decks are one of the most quoted outdoor jobs in Canada, and one of the most underpriced. The wood is only part of the cost. Footings, framing, hardware, railings, stairs, disposal of the old deck, and the permit all sit on top of the boards, and a quote that misses them is a job that loses money. Our free deck calculator does the material maths for you, and the fence installation pricing guide uses the same per-foot method for the other common outdoor job. This is general pricing information, not tax or legal advice; confirm permit and tax rules with your local building department and the CRA.
What a deck build costs per square foot
All figures below are Canadian dollars, installed, including footings, framing and standard railing unless noted, from Ontario cost guides published in 2026. Use ranges, not single numbers, because lumber prices, site access and the town you are in all move the price.
| Material | Cost per sq ft installed | Best for |
|---|---|---|
| Pressure-treated lumber | $35 to $65 | Budget builds, rental properties, simple decks |
| Cedar | $55 to $105 | A natural look with more upkeep |
| Composite, mid-range | $65 to $95 | Most family decks; low maintenance |
| PVC or capped polymer | $80 to $130 | Wet areas, pool decks, premium builds |
| Premium composite in the GTA | $90 to $160 | High-end Toronto builds with premium finishes |
Overall, expect $45 to $95 a square foot for a typical Ontario deck. The low end is a simple pressure-treated deck on flat ground with easy access. The high end is composite with stairs, railings, lighting and a permit in the GTA. Composite typically adds 40% to 60% over pressure-treated for a complete deck, so the material choice alone can move a quote by thousands.
Measure the job before you price it
Price the deck you are actually building, not the one the customer described on the phone. Measure it yourself, and write down everything that changes the price.
- Size and shape. Length and width, plus any bump-outs, angles or multi-level sections. A deck with two levels costs more per square foot than a rectangle, because every edge is framing and finishing.
- Height above grade. A deck more than 24 inches (0.6 metres) above grade generally needs a building permit in Ontario, and a high deck needs taller posts, bracing and stairs, which all cost more.
- Stairs and railings. Count the steps, the railing length and the gates. Stairs are the most expensive part per square foot of any deck, and they are the part most often left out of a quote.
- Site access. Can a truck get to the backyard, or is everything carried through the house? Bad access adds labour hours on every load of lumber.
- The old deck. Removal and disposal of an existing deck is a separate line item, not a favour. Price it, or the customer will assume it is included.
- Ground conditions. Footings in clay, rock or a wet yard take longer and cost more than footings in clean soil.
Take photos of all of it. The photos protect you when the customer asks why the quote is higher than the neighbour’s, and they are the record you need if the scope changes halfway through.
Materials: the biggest price lever
Materials are roughly half the cost of a deck build, and the material choice is the conversation to have with the customer first, because it sets the budget for everything else.
Pressure-treated lumber is the cheapest deck material, at $35 to $60 a square foot installed on most Ontario guides, and $45 to $65 on others. It is strong, available everywhere, and easy to work with. The trade-off is maintenance: it needs sealing, it checks and warps over time, and it will not look new for long. It suits budget builds, rental properties and simple decks.
Cedar runs $55 to $105 a square foot installed. It looks better than pressure-treated and smells better too, but it needs regular sealing and it is softer, so it dents and scratches. It suits a customer who wants a natural look and accepts the upkeep.
Composite, such as Trex Select, runs $65 to $95 a square foot installed for a mid-range board. It costs 40% to 60% more than pressure-treated for a complete deck, and it earns it back in maintenance: no sealing, no splinters, no rot, and it looks the same in year ten as in year one. Most family decks in Ontario are composite now, and most customers who can afford it choose it.
PVC and capped polymer run $80 to $130 a square foot installed, and premium capped composite in the GTA runs $90 to $160. These are for wet areas, pool decks and premium builds, where the customer is paying for the best finish and the longest life.
Do not forget the parts that are not boards. Footings, posts, beams, joists, hangers, screws, flashing, railing and stairs are all materials too, and on a high deck they can be a third of the material bill. Price the structure separately from the decking, so the customer sees where the money goes. The construction material calculator helps with the quantities.
Labour: what to charge for the build
Labour is 40% to 60% of the total cost of a deck build. On a per-foot basis, labour generally runs $25 to $50 a square foot, and $40 to $70 a square foot in Toronto and Vancouver, where wages and the cost of doing business are higher. A freelance carpenter doing basic framing and decking may charge $15 to $30 a square foot for labour alone, but that is not a complete installed price.
Work out your labour from your real costs, not from a rule of thumb. Add up the crew’s wages, including burden, the days the job will take, and the time for the permit, the inspections, the deliveries and the cleanup. Then add your overhead: truck, tools, insurance, WSIB, and the office time to quote and invoice the job. A deck that takes three days with two carpenters is not a three-day job, it is a three-day job plus a day of quoting, ordering, inspecting and invoicing.
A deck that takes three days to build takes five days of your business: quoting, ordering, permits, inspections, invoicing and follow-up. If you only price the build days, the other two days come out of your margin.
Charge for the crew you actually send. A two-person crew that finishes in four days costs the same in wages as a four-person crew that finishes in two, but the four-person crew needs a bigger truck, more tools and more supervision. Price the job, not the day rate.
Permits and extras people forget
In Ontario, a deck more than 24 inches above grade, or attached to the house, generally needs a building permit. Most GTA municipalities charge $150 to $600 for a deck permit, and Toronto typically charges $250 to $450. Check with the local building department before you quote, because the permit is the customer’s cost, not yours, and it should be a line item, not a surprise.
- Permit and inspections. The permit fee, plus the time to draw the plan, submit it and meet the inspector. Budget half a day.
- Disposal. Removing and disposing of an old deck, including the dump fee. Price it by the load.
- Lighting and extras. Post lights, stair lights, built-in seating, planters, privacy screens and under-deck drainage. Each one is a line item with a price, not a favour.
- Landscaping repair. The yard will not look the same after a deck build. Budget for sod, grading and cleanup, or agree in writing that it is the customer’s job.
- HST. In Ontario, HST applies to the job, and it should be shown separately on the quote, not buried in the total.
Put the permit in the quote as its own line, with the fee and the note that it is charged at cost. Customers accept a permit fee they can see. They do not accept a permit fee that appears after the job is signed.
Two worked examples
These are worked examples from Ontario guides, not quotes for a specific job. Your numbers will differ by town, site and material brand.
Example 1: a 12 by 16 foot deck, 192 square feet, pressure-treated. At $35 to $65 a square foot installed, the total runs $8,600 to $12,500, including footings, framing and standard railing. Materials are roughly half, labour roughly half, and the permit adds $150 to $600 on top. A simple ground-level deck with easy access lands near the low end. A high deck with stairs and a permit lands near the high end.
Example 2: a 200 square foot deck, composite. Pressure-treated would run $8,000 to $16,000. The same deck in mid-range composite runs $14,000 to $22,000, including the same footings, framing and railing. The composite premium is $6,000 or so on a deck this size, and it is the number to show the customer when they ask why composite costs more: no sealing, no splinters, and a deck that looks new in year ten.
| Deck | Pressure-treated | Composite |
|---|---|---|
| 12 x 16 ft (192 sq ft) | $8,600 to $12,500 | $12,500 to $18,200 |
| 200 sq ft | $8,000 to $16,000 | $14,000 to $22,000 |
| Cost per sq ft | $35 to $65 | $65 to $95 |
| Maintenance | Seal every 1 to 2 years | Wash only |
| Permit (GTA) | $150 to $600 | $150 to $600 |
Show the customer both columns. Most customers who see the two prices side by side choose composite, and the ones who choose pressure-treated do it knowingly, which means fewer arguments later.
A pricing formula you can reuse
Price every deck the same way, and the quotes get faster and more accurate with every job.
Write it down and photograph it.
Get a real lumber quote, not a guess.
Price the whole job, not the build days.
Line items, charged at cost.
A deck is a business, not a favour.
Let the customer choose their budget.
Present the quote as options, not as one number. A pressure-treated price, a cedar price and a composite price, side by side, with the maintenance difference spelled out, turns a price objection into a choice. The customer picks their budget instead of shopping you against the next contractor. Our roofing estimate guide uses the same options method, and the quoting tools in Contruva build the options into the estimate automatically.
Mistakes that eat your margin
Most deck jobs that lose money lose it in the same five places. Check for them before you sign the quote.
- Forgetting the stairs. Stairs are the most expensive part per square foot of any deck. Count the steps, price them, and put them on the quote.
- Forgetting the permit. A deck that needs a permit and does not have one stops the job, and the delay costs more than the fee.
- Pricing materials from memory. Lumber prices move. Get a quote from the yard for every job, and date it.
- Not charging for the old deck. Removal and disposal is real work with a real dump fee. If it is not on the quote, you are doing it for free.
- One price, no options. A single number invites the customer to compare it with the next contractor’s single number. Options invite them to choose.
Price the deck in front of the customer, line by line, and let them watch the numbers add up. A customer who has seen the materials, the labour, the permit and the options does not argue about the total, because they built it with you. And when the job is done, send the invoice the same day, with a deposit taken at signing: our getting paid faster guide covers the follow-up that closes the loop.
Sources
- HomeStars: deck construction costs: Ontario deck costs per square foot by material, labour share and example totals, 2026 guide.
- BuildersOntario: cost to build a deck: Ontario deck costs per square foot for pressure-treated and composite, 2026 guide.
- D&D Exterior: deck building cost Ontario: Ontario deck costs per square foot and material comparisons, 2026 guide.
- General West: deck building cost guide: GTA deck permit costs and premium composite ranges, 2026 guide.