All guidesTemplateFree template · Updated November 2026

A plumbingestimate templateyou can copy today.

A good plumbing estimate names the job, splits labour and parts, states what’s excluded and expires on a date. Copy the format below, then see a worked example with real arithmetic.

A plumbing estimate template needs seven parts: your business details, the customer and site, a plain-language scope of work, a labour and parts breakdown, exclusions, tax and total, and an expiry date with acceptance terms. Copy the layout below, fill in your own rates and send it the same day you see the job.

The numbers in the example are illustrations, not market rates. Your labour rate, parts markup and tax depend on where you work and what your costs are. Use our contractor hourly rate calculator to find your own.

What a plumbing estimate must include

SectionWhat goes in itWhy it matters
Your detailsBusiness name, licence number, phone, insuranceProves you’re legitimate and licensed
Customer and siteName, address, access notesAvoids disputes about which property
Scope of workWhat you will do, in plain wordsDefines the job so extras can be priced
LabourHours × rate, or a flat labour priceShows where the money goes
Parts and materialsItemized with quantitiesLets the customer compare apples to apples
ExclusionsWhat isn’t includedPrevents “I thought that was covered”
Tax and totalGST/HST/PST or sales tax, then totalNo surprises at invoice time
TermsValid until, deposit, how to acceptCreates a decision date

The template

Copy this into a document, a spreadsheet or your quoting software.

Header
Estimate #, date, valid until.

Number every estimate so you can find it. Set an expiry of 14 to 30 days because parts prices move.

Parties
Your business and the customer.

Include licence number and the service address.

Scope
One short paragraph, then bullets.

Example: “Remove and dispose of existing 40-gallon tank. Install new 40-gallon unit. Test and commission.”

Labour
Hours × rate, or flat.

Show a trip charge separately if you charge one.

Parts
Item, quantity, unit price, line total.

Include small items like fittings and supply lines.

Exclusions
List them.

Drywall repair, permits unless stated, hidden rot, code upgrades found during work.

Totals
Subtotal, tax, total, deposit.

State the deposit amount in dollars.

Acceptance
Signature or approve online.

Add a date and a name.

Worked example: water heater swap

Here’s a 40-gallon replacement written the way the template says. Rates are illustrative: $115 per hour labour, 25% markup on parts, 13% HST.

LineQtyUnitTotal
Labour: remove old tank, install and commission3.5 h$115.00$402.50
Water heater, 40 gal (cost $780 + 25%)1$975.00$975.00
Supply lines, valves, fittings (cost $64 + 25%)1 kit$80.00$80.00
Disposal of old tank1$45.00$45.00
Subtotal$1,502.50
HST 13%$195.33
Total$1,697.83
Deposit 30%$509.35

Check the math: 3.5 × 115 = 402.50. 780 × 1.25 = 975. 64 × 1.25 = 80. Add 45 for disposal and the subtotal is 1,502.50. Thirteen percent of that is 195.325, rounded to 195.33. Your own tax depends on your province, so use the HST calculator if you’re unsure.

Not tax advice

Tax rules and registration thresholds vary. Check the CRA (Canada) or the IRS and your state (US) for what applies to you.

Scope-of-work wording that works

The scope is where most plumbing disputes start, so write it as if a stranger will read it. Name the fixture, the size or model, what you’re removing and what you’re leaving. Compare these two lines:

WeakStrong
Replace kitchen faucetSupply and install customer-selected single-handle kitchen faucet. Replace both supply lines and shut-off valves. Test for leaks.
Fix leak under sinkLocate source of leak under kitchen sink, replace P-trap and slip nuts as needed, test for 15 minutes.
Install water heaterRemove and dispose of existing tank. Install 40-gallon gas unit, connect water, gas and venting, test and commission.

The strong versions tell the customer what they’re buying and tell you what you’re on the hook for. If you’re asked to do something that isn’t in the scope, that’s a priced extra, not a favour.

Flat rate or time and materials?

Flat-rate quotes work for repeatable jobs like water heaters, toilets and faucets, because you know the hours. Time and materials suits repairs where the problem is hidden, like a leak behind a wall. Many plumbers do a hybrid: a flat diagnostic fee, then a firm price once they know what’s wrong. If you’re unsure how to set the price itself, read how to price a contractor job.

MethodBest forRisk
Flat rateRepeatable installsYou eat unexpected hours
Time and materialsUnknown repairsCustomer can’t budget
Diagnostic then flatLeaks, backupsCustomer may decline after the fee

Clauses that protect you

  • Hidden conditions: “If work reveals damaged piping, rot or code issues, we’ll stop and quote the extra before continuing.”
  • Change orders: any extra work gets approved in writing before it’s done. See how to handle a change order.
  • Price validity: “Valid for 30 days; parts prices may change after.”
  • Deposit: state the amount and when the balance is due. Our guide to contractor deposits covers typical amounts.
  • Permits: say who pulls them and who pays.

Estimate mistakes that cost plumbers money

  • Pricing parts at your cost with no markup, then losing the time you spent sourcing them.
  • Leaving out disposal, trip time and permit fees.
  • A one-line scope like “replace toilet” that the customer reads as “fix everything in the bathroom”.
  • No expiry date, so a quote from March gets accepted in October.
  • Waiting three days to send it. The first written quote often wins.

Good, better, best on a plumbing quote

On bigger jobs, offering options lifts your close rate because the customer picks instead of deciding yes or no. For a water heater you might show a standard tank, a higher-efficiency tank with a longer warranty, and a tankless unit with the extra gas and venting work itemized. Price each as its own total, recommend one, and let the customer choose. Do it the same way for repipes, fixture packages and sewer line work.

A short follow-up script also helps: “Hi Sam, it’s Alex from the plumbing company. I sent your water heater estimate yesterday. Any questions? I can hold Thursday morning for you.” It’s polite, specific and gives a reason to reply. Our guide on following up without being pushy has more.

Pre-send checklist

  • Customer name, phone and service address are correct.
  • Scope names the fixture, size and what you remove or leave.
  • Labour and parts are on separate lines.
  • Exclusions are listed, including permits, drywall and hidden conditions.
  • Tax is calculated at the right rate for your province or state.
  • The deposit is stated as a dollar amount.
  • A valid-until date is on the first page.
  • There is an easy way to accept, by signature or a tap.

Run that list every time. It takes thirty seconds and prevents most of the arguments that happen on invoice day. If you keep your estimates in a spreadsheet, build the checklist into the top row so you can’t skip it.

Keep copies of every estimate, accepted or not. When a customer calls six months later asking about the same job, you can pull the original, update the parts prices and send a new one in minutes. Over a year, that archive also shows which jobs you win and which you lose, so you can adjust prices where you’re consistently too high or too low.

How to send and follow up

Send the estimate before you leave the driveway if you can, with a one-tap way to accept. Follow up the next day with one line. Contruva’s quotes build the estimate from your saved line items, let the customer approve on their phone and convert it to a job and an invoice with one tap. If you’re also missing calls while you’re under a sink, an AI receptionist for plumbers answers and books them for you. Plumbing shops can see how it all fits on the plumbing industry page, or start a 7-day free trial.

01Questions

Straight answers.

Still unsure? Call us at +1 (647) 922-5436. A real person picks up.

Ask us anything

What should a plumbing estimate include?

Your business and licence details, the customer and site, a plain scope of work, labour and itemized parts, exclusions, tax and total, and an expiry date with acceptance terms.

How do I write a plumbing estimate?

Walk the job, write the scope in plain words, price labour and parts separately, list exclusions, add tax and set a valid-until date. Send it the same day.

Should a plumbing estimate be free?

Many plumbers quote simple installs for free and charge a diagnostic fee for repairs where they have to find the problem. Say which applies before you go.

How long is a plumbing estimate good for?

Most are valid for 14 to 30 days because parts prices change. Put the expiry date on the estimate.

Is an estimate the same as a quote?

People use them interchangeably. A quote usually means a firm price; an estimate can mean an approximate one. State clearly which yours is.

Send it from the truck, not the kitchen table.

Quotes your customers can accept on their phone.

Start free trial