A plumbing estimate template needs seven parts: your business details, the customer and site, a plain-language scope of work, a labour and parts breakdown, exclusions, tax and total, and an expiry date with acceptance terms. Copy the layout below, fill in your own rates and send it the same day you see the job.
The numbers in the example are illustrations, not market rates. Your labour rate, parts markup and tax depend on where you work and what your costs are. Use our contractor hourly rate calculator to find your own.
What a plumbing estimate must include
| Section | What goes in it | Why it matters |
|---|---|---|
| Your details | Business name, licence number, phone, insurance | Proves you’re legitimate and licensed |
| Customer and site | Name, address, access notes | Avoids disputes about which property |
| Scope of work | What you will do, in plain words | Defines the job so extras can be priced |
| Labour | Hours × rate, or a flat labour price | Shows where the money goes |
| Parts and materials | Itemized with quantities | Lets the customer compare apples to apples |
| Exclusions | What isn’t included | Prevents “I thought that was covered” |
| Tax and total | GST/HST/PST or sales tax, then total | No surprises at invoice time |
| Terms | Valid until, deposit, how to accept | Creates a decision date |
The template
Copy this into a document, a spreadsheet or your quoting software.
Number every estimate so you can find it. Set an expiry of 14 to 30 days because parts prices move.
Include licence number and the service address.
Example: “Remove and dispose of existing 40-gallon tank. Install new 40-gallon unit. Test and commission.”
Show a trip charge separately if you charge one.
Include small items like fittings and supply lines.
Drywall repair, permits unless stated, hidden rot, code upgrades found during work.
State the deposit amount in dollars.
Add a date and a name.
Worked example: water heater swap
Here’s a 40-gallon replacement written the way the template says. Rates are illustrative: $115 per hour labour, 25% markup on parts, 13% HST.
| Line | Qty | Unit | Total |
|---|---|---|---|
| Labour: remove old tank, install and commission | 3.5 h | $115.00 | $402.50 |
| Water heater, 40 gal (cost $780 + 25%) | 1 | $975.00 | $975.00 |
| Supply lines, valves, fittings (cost $64 + 25%) | 1 kit | $80.00 | $80.00 |
| Disposal of old tank | 1 | $45.00 | $45.00 |
| Subtotal | $1,502.50 | ||
| HST 13% | $195.33 | ||
| Total | $1,697.83 | ||
| Deposit 30% | $509.35 |
Check the math: 3.5 × 115 = 402.50. 780 × 1.25 = 975. 64 × 1.25 = 80. Add 45 for disposal and the subtotal is 1,502.50. Thirteen percent of that is 195.325, rounded to 195.33. Your own tax depends on your province, so use the HST calculator if you’re unsure.
Tax rules and registration thresholds vary. Check the CRA (Canada) or the IRS and your state (US) for what applies to you.
Scope-of-work wording that works
The scope is where most plumbing disputes start, so write it as if a stranger will read it. Name the fixture, the size or model, what you’re removing and what you’re leaving. Compare these two lines:
| Weak | Strong |
|---|---|
| Replace kitchen faucet | Supply and install customer-selected single-handle kitchen faucet. Replace both supply lines and shut-off valves. Test for leaks. |
| Fix leak under sink | Locate source of leak under kitchen sink, replace P-trap and slip nuts as needed, test for 15 minutes. |
| Install water heater | Remove and dispose of existing tank. Install 40-gallon gas unit, connect water, gas and venting, test and commission. |
The strong versions tell the customer what they’re buying and tell you what you’re on the hook for. If you’re asked to do something that isn’t in the scope, that’s a priced extra, not a favour.
Flat rate or time and materials?
Flat-rate quotes work for repeatable jobs like water heaters, toilets and faucets, because you know the hours. Time and materials suits repairs where the problem is hidden, like a leak behind a wall. Many plumbers do a hybrid: a flat diagnostic fee, then a firm price once they know what’s wrong. If you’re unsure how to set the price itself, read how to price a contractor job.
| Method | Best for | Risk |
|---|---|---|
| Flat rate | Repeatable installs | You eat unexpected hours |
| Time and materials | Unknown repairs | Customer can’t budget |
| Diagnostic then flat | Leaks, backups | Customer may decline after the fee |
Clauses that protect you
- Hidden conditions: “If work reveals damaged piping, rot or code issues, we’ll stop and quote the extra before continuing.”
- Change orders: any extra work gets approved in writing before it’s done. See how to handle a change order.
- Price validity: “Valid for 30 days; parts prices may change after.”
- Deposit: state the amount and when the balance is due. Our guide to contractor deposits covers typical amounts.
- Permits: say who pulls them and who pays.
Estimate mistakes that cost plumbers money
- Pricing parts at your cost with no markup, then losing the time you spent sourcing them.
- Leaving out disposal, trip time and permit fees.
- A one-line scope like “replace toilet” that the customer reads as “fix everything in the bathroom”.
- No expiry date, so a quote from March gets accepted in October.
- Waiting three days to send it. The first written quote often wins.
Good, better, best on a plumbing quote
On bigger jobs, offering options lifts your close rate because the customer picks instead of deciding yes or no. For a water heater you might show a standard tank, a higher-efficiency tank with a longer warranty, and a tankless unit with the extra gas and venting work itemized. Price each as its own total, recommend one, and let the customer choose. Do it the same way for repipes, fixture packages and sewer line work.
A short follow-up script also helps: “Hi Sam, it’s Alex from the plumbing company. I sent your water heater estimate yesterday. Any questions? I can hold Thursday morning for you.” It’s polite, specific and gives a reason to reply. Our guide on following up without being pushy has more.
Pre-send checklist
- Customer name, phone and service address are correct.
- Scope names the fixture, size and what you remove or leave.
- Labour and parts are on separate lines.
- Exclusions are listed, including permits, drywall and hidden conditions.
- Tax is calculated at the right rate for your province or state.
- The deposit is stated as a dollar amount.
- A valid-until date is on the first page.
- There is an easy way to accept, by signature or a tap.
Run that list every time. It takes thirty seconds and prevents most of the arguments that happen on invoice day. If you keep your estimates in a spreadsheet, build the checklist into the top row so you can’t skip it.
Keep copies of every estimate, accepted or not. When a customer calls six months later asking about the same job, you can pull the original, update the parts prices and send a new one in minutes. Over a year, that archive also shows which jobs you win and which you lose, so you can adjust prices where you’re consistently too high or too low.
How to send and follow up
Send the estimate before you leave the driveway if you can, with a one-tap way to accept. Follow up the next day with one line. Contruva’s quotes build the estimate from your saved line items, let the customer approve on their phone and convert it to a job and an invoice with one tap. If you’re also missing calls while you’re under a sink, an AI receptionist for plumbers answers and books them for you. Plumbing shops can see how it all fits on the plumbing industry page, or start a 7-day free trial.