All articlesHiring6 min read · November 2026

How to hirea subcontractorwithout the headaches.

Hiring a subcontractor is how a small contractor takes on a bigger job without hiring full time. The right sub makes you look good, finishes on time and comes back for the next job. The wrong one costs you the customer, the schedule and your margin, sometimes all three on the same job.

Most subcontractor problems are not bad luck. They are a vague scope, a price agreed by text message, and nobody checking the work until the customer complains. Get those three things right and the rest is manageable.

Start with the job, not the person

Before you call anyone, write down what the sub is actually doing. Not "do the electrical" but the real scope: the number of circuits, the fixtures, the panel work, the inspection, and who supplies the materials. A sub who prices a clear scope gives you a real number. A sub who prices a vague one gives you a guess, and the argument starts when the guess runs out.

Write down the schedule too: the start date, the days on site, and the date it has to be done. Tell the sub what the job pays and when, before they start. If you cannot state the scope, the price and the dates in one short message, you are not ready to hire anyone yet. Our guide to pricing a contractor job walks through how to build the number the sub’s price has to fit inside.

One page is enough

Scope, price, dates, who supplies materials, and how change orders work. If it fits on one page, both sides understand it. If it needs ten pages, the job is not scoped yet.

Where good subs actually come from

The best subcontractors rarely advertise. They get their work from people who already know them. That is why your first hires should come from your own network, not a job board.

  • Your supplier’s counter. The staff at your trade supplier know who buys the right materials, pays on time and does tidy work. Ask them who they would hire for your job.
  • Other contractors. A contractor in a different trade is the best reference there is. Ask your plumber who does his electrical, and your electrician who does his drywall.
  • Past crews. The apprentice who left to go out on his own, the sub you used once two years ago, the crew from a job that went well. Keep a short list of people you would call again, and keep it current.
  • Trade associations and local groups. Your local home builders’ association and trade groups are full of subs who are established enough to join and show up.
  • Job boards, last. A listing will get you applicants, but it will not tell you who is good. Use it when the network runs dry, and vet harder.

When someone comes recommended, ask the person who recommended them one question: would you hire them again on your own house? The hesitation in the answer tells you more than the recommendation does.

Vet before the first real job

A good sub expects to be checked. A bad one gets offended. Checking takes an hour and saves a job.

Insurance
Ask for it in writing.

A certificate of insurance naming your company, current and covering the work. If they cannot produce one, they are not ready for your job.

WSIB or workers’ comp
Confirm their coverage is active.

In Ontario, confirm WSIB clearance before they step on site. If a sub has no coverage and someone gets hurt, the liability can land on you. Check your own province’s rules the same way.

Licence
Check the trade licence where the trade is regulated.

Electricians, plumbers and gas fitters need licences in most provinces. Ask for the number and check it with the regulator.

References
Call two, and ask about the last job.

Not "were they good" but "did they finish on the date they promised, and did you have to chase them for anything?"

A small test job
Start small on purpose.

Give a new sub a one-day or two-day job first, even if you have bigger work waiting. How they handle a small job is how they will handle a big one.

Also ask what they are doing the week your job runs. A sub who is already booked solid and squeezes you in is a sub who will not be there on Tuesday. A good sub tells you their real availability, even if it costs them the job.

Get the paperwork right

A handshake and a text message are how most subcontractor disputes start. A short written agreement is how they end quickly. It does not need a lawyer for most jobs. It needs the terms both sides agreed to, written down before the work starts.

  • Scope. Exactly what is included, and what is not. Materials supplied by whom, cleanup included or not, and who handles the inspection.
  • Price. Fixed price, hourly, or per unit, and what happens when the scope changes. A change order is agreed in writing before the extra work starts, not after.
  • Payment terms. When they get paid, what triggers payment, and whether you hold back anything until the work passes inspection. In Ontario, the Construction Act sets prompt payment rules for subcontractors: once you are paid, you generally have seven days to pay your sub. Check your province’s rules.
  • Schedule. Start date, finish date, and what happens if the job slips. If your customer’s date moves, tell the sub early.
  • Taxes. Are they charging HST on their invoice, and are they registered? If they are not registered and you are, sort out who is charging what before the first invoice arrives. Keep every invoice with the job it belongs to, so your accountant can claim the input tax credits.
  • Quality and safety. The standard the work has to meet, and who is responsible for fixing it if it does not. The sub works to your standard, on your site, under your safety rules.

One more thing to settle up front: who talks to the customer. In most cases, that is you. The customer hired your company, and the sub going around you to offer extras or complain about the price is a problem you can prevent with one sentence in the agreement.

Manage the job like it is yours

It is yours. The customer does not care who did the work. They care that it is done right and on time, and your name is on the contract.

Check the work while it is happening, not after it is finished. A quick visit at the start of the day and a photo of the progress at the end catches problems when they are cheap to fix. Ask for photos of anything that will be covered up, like rough-in work before the drywall goes on. If the sub knows you will look, the work is better.

Pay on time, every time. The fastest way to lose a good sub is to make them chase their money. Agree the payment date, pay it, and tell them when it is sent. Good subs remember who pays on time, and they take those calls first when they are busy.

The morning check-in

One text a day: "On site at 8, done by 4, send me a photo when the rough-in is done." It takes thirty seconds and stops most surprises.

When it goes wrong

Sometimes it does, even with a good sub. The work is not up to standard, the dates slip, or the sub stops answering. Do not let it drift. Talk to them the same day, in person if you can, and be specific about what has to change and by when.

Pay for the work that was done properly, even if you are parting ways. Withholding everything turns a bad job into a dispute, and a dispute turns into a lien risk. Document what was wrong with photos and dates, agree the split in writing, and move on. The lesson is worth more than the argument.

And keep a note. Write down what happened while it is fresh, so the next time the name comes up you remember why. A short list of subs you trust, and a short list of subs you will not call again, is one of the most valuable things a growing contractor owns. Contruva keeps your subs, their rates, their insurance dates and every job they worked on in one place, so the next hire starts from what you already know instead of from scratch. If the job itself needs pricing first, the contractor estimate template and the guide to change orders cover the paperwork that goes around it.