A contractor estimate templateyou can copytoday.

A good contractor estimate template has seven parts: your details, the customer and job, the scope in sections, allowances, exclusions, terms and a signature. Copy the one below, fill in your numbers, and send it the same day you visit.

A contractor estimate template is a ready-made structure for a professional estimate: your business details at the top, the customer and the job underneath, the scope broken into priced sections, allowances for anything unpicked, exclusions, payment terms, an expiry date and a place to sign. The template below has all of it, and it works for any trade. Copy it into a document or into your quoting software, fill in your numbers, and send it.

Why use a template at all? Because the estimate that arrives first and is easiest to understand usually wins, and a template is what makes same-day estimates possible. It also protects you: a written scope, stated exclusions and a unit price for unknowns are what stop a job from turning into an argument halfway through. For trade-specific versions, see our roofing estimate template, HVAC estimate template, plumbing estimate template and landscaping estimate template.

What goes in a contractor estimate

Every estimate, whatever the trade, needs the same seven parts. If any one is missing, the estimate is either hard to trust or hard to enforce.

PartWhat it doesIf it is missing
Your detailsBusiness name, address, phone, email, licence numberThe customer cannot check you out or pay you
Customer and jobCustomer name, job address, date, estimate numberDisputes about which job and which price
Scope in sectionsThe work, broken into priced line itemsThe customer shops on the lump sum alone
AllowancesDollar figures for unpicked fixtures and materialsYou absorb the cost of their expensive taste
ExclusionsWhat is not includedYou do the extra work for free
Terms and expiryDeposit, payment schedule, warranty, expiry dateSlow payment and stale prices
SignatureA place to approve and pay a depositA quote that never becomes a job

Our guide to writing a contractor estimate that wins the job explains the thinking behind each part. The template below is the structure itself.

The template: copy this

Copy the whole block, replace the bracketed parts, and delete any section that does not apply. Keep the rest in the same order every time, so customers learn where to look.

Header
[Your business name] · [Address] · [Phone] · [Email] · [Licence number]

Estimate #[number] · Date: [date] · Valid until: [date, 30 days out]

Customer
[Customer name] · [Job address] · [Phone] · [Email]

One line each. The job address matters: it is the address the price applies to.

Scope
A short paragraph: what you are doing, in plain language.

“Full bathroom renovation, same layout: remove existing fixtures and tile, install new shower, vanity, toilet and tile floor, as itemized below.”

Section 1: Demolition
Line items with quantities and prices.

Example: “Demolition and disposal, 1 lot — $1,200.”

Section 2: Rough-in
Plumbing and electrical, or the equivalent for your trade.

Subtrade work goes here, at the subtrade’s quoted price.

Section 3: Materials
Every material, with a quantity and a unit price.

Tile, fixtures, lumber, paint, hardware. Price from current supplier prices.

Section 4: Labour
Your crew’s time, by trade or by day.

Price at the loaded rate, not the wage.

Section 5: Finishing
Trim, paint, cleanup, walkthrough.

The last 5% of the job is the part the customer sees. Price it.

Allowances
One line per unpicked item, with a dollar figure.

“Tile allowance: $1,200. Lighting allowance: $600.”

Exclusions
What is not included, in plain language.

“Excludes: permits, moving plumbing, structural work, asbestos abatement.”

Unknowns
A unit price for what you cannot see yet.

“Rotten subfloor: $X per 4×8 sheet, replaced only as found, photographed and confirmed the same day.”

Total
Subtotal, tax, and total.

“Subtotal $24,470. HST 13% $3,181. Total $27,651.” Tax depends on your province; see below.

Payment terms
Deposit, progress payments, balance on completion.

“Deposit 30% on approval. Balance due on completion. Visa, Mastercard, e-transfer.”

Warranty
Your workmanship warranty, and the manufacturer warranty, stated separately.

“Workmanship warranty: 2 years. Manufacturer warranties as per product.”

Signature
Customer signature and date, plus a deposit payment link.

“Approved: ______________________ Date: __________”

That is the whole template. Everything below is how to fill it in well, and what not to do.

How to fill in each section

Your details. Put your licence number on every estimate if your province requires one, and your WSIB or workers’ comp status if customers ask. It costs nothing and it separates you from the cash-only operator.

Customer and job. Use the job address, not the billing address, when they differ. Number your estimates sequentially, starting at a number that does not look like your first job.

Scope. One paragraph, plain language, no jargon. If a homeowner cannot read the scope and picture the finished job, rewrite it. The scope is also your protection: if it is not in the scope, it is a change order.

Sections. Break the work into sections the customer will recognize: demolition, rough-in, materials, labour, finishing. You do not need to show your unit costs for everything, but each section should say what is being done and, where it matters, the brand, model or grade of material. For the trade-specific detail, our roofing estimate guide shows how a roofer breaks a job into squares, pitch and waste, and how to price a bathroom renovation shows a full bathroom build-up.

Unknowns. The most common estimating dispute is the thing nobody could see: rotten decking, a cracked drain, an extra layer of shingles. Put a unit price on the estimate and have the customer sign it with everything else. A unit price turns a surprise into a line item instead of an argument.

How to price the lines

A template is only as good as the numbers in it. Price every line from your real costs, in this order.

CostHow to price itCommon mistake
LabourLoaded rate: wage plus vacation pay, CPP and EI, workers’ comp and benefitsCosting at the wage, which quietly gives away 20% to 35%
MaterialsCurrent supplier prices, pre-taxPricing from memory or from the last job
SubtradesTheir written quote for this jobUsing a verbal ballpark as a firm number
OverheadYour overhead rate on direct costsForgetting the truck, insurance and office entirely
ProfitA planned margin, not what is left overTreating profit as whatever survives
TaxHST or GST on the full selling price, if registeredCharging tax on labour only, or marking up tax-included prices

The difference between markup and margin is where good contractors lose money without realizing it. Markup is a percentage of your cost; margin is a percentage of your price. If a job costs $10,000 and you mark it up 20%, you charge $12,000, but your margin is only $2,000 ÷ $12,000, or 16.7%. To hit a 20% margin you need to charge $12,500. The formula is price = cost ÷ (1 − margin). Our pricing guide explains it with a worked example, and the free contractor markup calculator does the conversion both ways.

Price materials pre-tax

If you are registered for GST/HST, you claim the tax you paid on materials back as an input tax credit. Mark up the pre-tax cost, then charge HST on your selling price. Marking up the tax-included price and charging HST again means your customer pays tax on tax. See our guide on whether contractors charge HST on materials.

Allowances and exclusions

Allowances. Give a dollar figure for every fixture and finish the customer has not picked yet: tile, faucets, lighting, vanity, mirror, appliances. State the allowance on the estimate, and state the rule: if they pick something above the allowance, the difference is added to the final invoice. An allowance is a budget the customer agreed to, not a guess.

Exclusions. List what is not included, in plain language. Common ones: permits, moving plumbing or electrical, structural work, asbestos abatement, painting beyond the room, fixtures the customer is supplying, and anything behind the walls that you cannot see. Exclusions protect you and the customer. If there is an allowance, like $1,200 for tile, say so and explain what happens if they pick something pricier.

Put the unknowns line right next to the exclusions, so the customer reads them together. “Decking: we inspect the full deck after tear-off. Any damaged sheathing is replaced at $X per sheet, supplied and installed, photographed before replacement.”

Terms, deposit and expiry

Deposit. Ask for one. A common structure is 30% on approval, a progress payment at the midpoint for larger jobs, and the balance on completion. Taking a deposit on approval is also the moment a quote becomes a job, so make it easy: a payment link on the estimate, not a cheque in the mail.

Payment schedule. State when each payment is due and what happens if it is late. Our guide on contractor payment terms covers deposits, progress payments and late fees in full.

Expiry. Put a date on the estimate, usually 15 or 30 days. Material prices move, and an expiry protects you while gently encouraging a decision. State it plainly: “This price is valid until [date].”

Warranty. State your workmanship warranty and the manufacturer warranty separately, with the length of each. A warranty you state in writing is worth more than one you mention in conversation.

Tax. If you are registered for GST/HST, charge it on the full price of the job, materials and labour included, and show it as its own line. The rate depends on where the work is done, not where your shop is. This is general information, not tax advice; check the CRA for the current rates and rules. If your taxable revenue is $30,000 or less over four consecutive calendar quarters, you may be a small supplier and not have to register, but then you cannot claim input tax credits either.

Mistakes that cost you the job

  • One lump sum, no sections. The customer cannot see what they are paying for, so they shop on price alone. Break it into sections.
  • Vague scope. “Renovate bathroom: $18,000” leaves the customer guessing and leaves you exposed. Spell out the work.
  • No allowances. The customer picks the $900 faucet and expects you to absorb it.
  • No exclusions. You do the extra work for free, or you argue about it halfway through.
  • No expiry date. A quote from three months ago at old material prices is a loss you agreed to.
  • Labour at the wage. Costing a carpenter at $35 an hour when the loaded rate is $45 quietly gives away the margin.
  • Slow delivery. An estimate that arrives in two weeks says the opposite of what a same-day estimate says, no matter how good it is. Aim to send it within 24 hours of the visit.
  • No signature line. A quote without a place to approve and pay a deposit is a document, not a decision.

The follow-up matters as much as the template. Most quotes are not lost to a cheaper crew; they are lost to silence. Follow up on day 1, day 3 and day 7, with something useful each time, and make it easy to say no. Our follow-up guide has the exact rhythm and example texts.

From paper template to signed job

A template on paper still needs typing, emailing, printing and chasing. The faster version is quoting software: your price book lives in the app, so the vanity, the shower valve and a day of tile labour are line items you pick, not numbers you retype. You build the estimate on site, send it before you leave the driveway, and see the moment the customer opens it. They sign on their phone and pay the deposit on the spot.

Contruva’s quoting software works that way, with the template above built in, automatic follow-ups on every open quote, and the job flowing straight into scheduling and invoicing once it is signed. It is one plan at $249.99 CAD or US$179.99 a month, with a 7-day free trial and no credit card. Start from the template on this page, run a real job through it, and keep the parts that fit the way you work.

Sources

01Questions

Straight answers.

Still unsure? Call us at +1 (647) 922-5436. A real person picks up.

Ask us anything

What should a contractor estimate template include?

Your business details, the customer and job, the scope in priced sections, allowances for unpicked items, exclusions, a unit price for unknowns, payment terms, an expiry date, warranty and a signature line.

Is there a free contractor estimate template?

Yes, the template on this page is free to copy. Contruva also includes estimate templates in its quoting software, with a price book, online signing and deposit collection, on a 7-day free trial.

How much deposit should a contractor ask for?

A common structure is 30% on approval, a progress payment at the midpoint for larger jobs, and the balance on completion. State the schedule on the estimate and take the deposit by payment link, not by cheque.

How long should a contractor estimate be valid?

Long enough for the customer to decide, short enough to protect you from material price changes. Fifteen to thirty days is common; state the date on the estimate.

Do I charge HST on a contractor estimate?

If you are registered for GST/HST, you charge it on the full price of the job, materials and labour included, and show it as its own line. Price materials on their pre-tax cost, since you claim the tax back as an input tax credit.

What is the difference between an estimate and a quote?

In practice, contractors use the two words for the same document: a priced proposal for a defined scope. The important part is that the scope, exclusions, allowances and expiry are written down, whatever you call it.

Estimates they sign.

Build it on site, get the deposit on approval.