All guidesCostsUpdated November 2026 · Updated November 2026

How to pricea roofing jobper square.

A square is 100 square feet of roof, and pricing per square is how most roofers quote. Here is how to measure it, adjust for pitch and waste, and build a per-square price that actually covers your costs.

To price a roofing job per square, measure the roof in squares (one square is 100 square feet of roof surface), adjust the area for the roof’s pitch, add a waste allowance, then build the price from four parts: materials, labour, disposal and overhead, plus profit. A typical installed price for asphalt shingles lands in the hundreds of dollars per square, and the exact number depends on your material, your labour rate and how cut up the roof is. The method below works for any material; swap in your own supplier and labour numbers and the answer is yours.

This guide uses Canadian examples and Canadian spelling, and every worked number is labelled as an example with stated assumptions, not a market rate. Your supplier’s price list and your crew’s production rate are the numbers that matter.

What is a roofing square?

A roofing square is 100 square feet of roof surface, not 100 square feet of floor. A 1,500 square foot house with a simple gable roof might have 18 to 22 squares of roof surface once you count the slope, the overhangs and the waste. Shingles are sold by the bundle, and three bundles of standard three-tab or architectural shingles cover one square, so the square is the unit that ties your material order, your labour and your price together.

Pricing per square is useful because it scales. Whether the roof is 12 squares or 40, the same method gives you a price, and it lets you compare jobs and spot the ones where your price drifted. It also makes the quote easier for the customer to understand: they can see the roof size, the material and the rate, instead of one big number with nothing behind it.

Measure the roof in squares

Measure from the ground or from a satellite image first, then confirm on the roof. The steps:

1
Measure each plane.

Length times width for every flat section of roof, in feet. A plane 30 feet long and 16 feet wide is 480 square feet.

2
Add the planes together.

A simple gable roof has two planes. A hip roof has four, plus ridges and hips that need cap shingles.

3
Add overhangs and dormers.

Measure to the edge of the roof, not the edge of the wall, and add dormer cheeks and valleys separately.

4
Divide by 100.

Total square feet divided by 100 is the number of squares before pitch and waste.

5
Confirm on site.

Check the deck condition, the number of layers to strip, chimney and skylight flashing, and access for the dumpster and the crew.

Our free roofing calculator does the plane math for you, and the roof pitch calculator works out the slope. Measure twice; a 10% error on a 25-square roof is two and a half squares of material and labour you either eat or overcharge for.

Adjust for pitch

The steeper the roof, the more surface it has for the same footprint, and the slower your crew works on it. Multiply the flat area by the pitch factor to get the true roof area:

Roof pitchPitch factorWhat it means
4/121.054Low slope; barely more than the flat area
6/121.118Common on newer homes; about 12% more surface
8/121.202Steep; slower to work, more safety setup
10/121.302Very steep; plan for staging and extra time
12/121.41445 degrees; specialist work, price it that way

The factor is the square root of one plus the square of the rise over run, so a 6/12 pitch is the square root of 1.25, or 1.118. A 1,800 square foot footprint at 6/12 is about 2,012 square feet of roof, or 20 squares before waste.

Then add waste. A simple gable roof usually needs 10% extra for cuts, starter courses and ridge caps. A cut-up roof with hips, valleys, dormers and skylights needs 15% or more, because every valley and hip eats shingles. In cold Canadian climates, also allow for ice and water shield at the eaves and in the valleys, which most building codes expect and which adds material and labour per square.

What goes into a per-square price

A per-square price has four parts. Price each one separately, then add them, or you will never know which part is eating your margin.

PartWhat it includesWhere roofers get it wrong
MaterialsShingles, underlayment, ice and water shield, drip edge, flashing, nails, ridge caps, ventsPricing from last year’s supplier list; forgetting flashing and vents
LabourTear-off, install, cleanup, at your loaded rate (wage plus burden)Using the wage instead of the loaded cost; ignoring steep-pitch slowdowns
Disposal and accessDumpster, disposal fees, delivery, permitsForgetting the second dumpster on a two-layer tear-off
Overhead and profitInsurance, truck, office, warranty reserve, then profitTreating profit as whatever is left over

Labour is where most per-square prices go wrong. A $30 an hour roofer costs more than $30 an hour once you add vacation pay, CPP and EI contributions, workers’ comp premiums and benefits. Depending on your province, that burden often adds 20% to 35% on top of the wage. Cost labour at the loaded rate, or every job quietly loses money. Our guide on how to price a contractor job explains overhead and markup vs margin in detail.

Material choice moves the per-square price more than anything else. Architectural asphalt shingles are the cheapest per square and the most common. Metal roofing costs several times more per square in materials but lasts far longer, and cedar and slate sit above that again. Quote the material the customer asked for, and show the upgrade as an option rather than a single take-it-or-leave-it number. See how to write a roofing estimate for the layout that wins jobs.

A worked example: a 20-square roof

Here is a full worked example with stated assumptions. Swap in your own numbers and the method is the same. The job: a 2,000 square foot roof surface at 6/12 pitch, architectural shingles, one layer to strip, simple gable, Ontario.

LineAssumptionAmount
Roof area20 squares after pitch adjustment20 squares
Waste allowance10% on a simple gable2 squares
Materials$310 per square (shingles, underlayment, flashing, caps)$6,820 for 22 squares
Labour$260 per square at the loaded rate$5,200 for 20 squares
Tear-off and disposal$55 per square$1,100
SubtotalMaterials + labour + disposal$13,120
Overhead at 15%Insurance, truck, office, warranty reserve$1,968
Profit at 10%Planned profit, not leftovers$1,509
Total before taxPer-square price: $16,597 ÷ 20About $830 per square

The per-square price that comes out is about $830 in this example, and it only holds if the assumptions do. Change the material to premium shingles, add a second layer to strip, or move to a 10/12 pitch, and the number moves with it. That is the point of pricing per square: the customer can see why the number is what it is, and you can see which part changed when the job changes.

Check the total against the market

Once you have your per-square price, multiply it out and compare the total with what similar roofs go for in your town. If you are far above, look for waste in your costs before you cut profit. If you are far below, you have been leaving money on the table.

Mistakes that eat your margin

  • Quoting the footprint, not the roof. A 1,500 square foot house is not 15 squares. Pitch, overhangs and waste add 20% to 40% on top of the footprint.
  • Forgetting the second layer. Older roofs often have two layers of shingles. Tear-off and disposal double, and the deck underneath may need repair.
  • Pricing labour at the wage. The loaded rate, with burden, is the real cost. Costing at the wage underprices every job by a fifth or more.
  • Skipping the waste allowance. Valleys, hips and dormers eat shingles. A 10% allowance on a cut-up roof is not enough.
  • Leaving flashing out of the price. Chimney, skylight and wall flashing is real material and real time. Price it, or pay for it yourself.
  • No allowance for deck repair. Rotten decking shows up once the shingles are off. Put a per-sheet price in the quote so the customer already agreed to it.
  • Forgetting tax on the quote. In Canada, GST/HST applies to the full job, materials and labour included. See do contractors charge HST on materials.

The fix for most of these is the same: a checklist you run on every roof before the quote goes out, and a quote template that lists each part so nothing gets skipped. Contruva’s quotes do this from a price book you set once, so the per-square rate, the flashing and the deck repair allowance are already in the template.

Turn the price into a quote that wins

A good per-square price still loses the job if the quote is slow, vague or hard to sign. Send it within 24 hours of the site visit, show the breakdown (squares, material, rate, extras), list what is not included, give the customer two or three options (good, better, best), and put an expiry date of 15 or 30 days on it. Material prices move, and an expiry protects you while gently encouraging a decision.

Make it easy to say yes: a link they can open on their phone, approve with a signature and pay the deposit on the spot. Then follow up if they have not replied. Our guide on how to follow up on a quote without being pushy covers the rhythm that wins the most jobs. With Contruva you can build the estimate on site from your price book, send it before you leave the driveway, and see the moment the customer opens it, all for one plan at $249.99 CAD a month with a 7-day free trial and no credit card.

Sources

01Questions

Straight answers.

Still unsure? Call us at +1 (647) 922-5436. A real person picks up.

Ask us anything

How many square feet is a roofing square?

One roofing square is 100 square feet of roof surface. A 2,000 square foot roof surface is 20 squares, before you add a waste allowance.

How much should I charge per square for roofing?

It depends on your material, labour rate and the roof’s pitch and complexity. Build the price from materials, loaded labour, disposal and overhead plus profit, using your own supplier prices, and check the total against similar jobs in your town. The worked example on this page comes out at about $830 a square with its stated assumptions.

How do I adjust for roof pitch when pricing per square?

Multiply the flat area by the pitch factor: 1.054 for 4/12, 1.118 for 6/12, 1.202 for 8/12, 1.302 for 10/12 and 1.414 for 12/12. That gives the true roof surface, which you then divide by 100 to get squares.

How much waste should I add when pricing a roof?

About 10% on a simple gable roof, and 15% or more on a cut-up roof with hips, valleys, dormers and skylights, because every valley and hip eats shingles.

Do I charge HST on a roofing job in Canada?

Yes, if you are registered for GST/HST. You charge it on the full price of the job, materials and labour included, and you claim back the HST you paid on materials as an input tax credit. This is general information, not tax advice.

What is usually left out of a per-square roofing price?

Flashing, deck repair, a second layer of tear-off, permits and disposal are the usual ones. List them as line items or allowances in the quote so the customer has already agreed to them.

Quotes priced right.

Send it from the driveway, before the next roofer does.

Start free trial