A good roofing estimate template lists the property, the measured roof area in squares, the scope (tear-off, underlayment, shingles, flashing, ventilation), the materials, the labour, disposal, anything excluded, the total price, the payment schedule and how long the quote is valid. Copy the template below and replace the bracketed parts with your own numbers.
One square is 100 square feet of roof. Most homeowners compare two or three written quotes, so the estimate that is clearest about scope and what’s not included tends to win, even when it isn’t the cheapest. The prices in the worked example are illustrations, not market rates. Use your own supplier costs and labour rates.
The roofing estimate template
Paste this into your quoting tool, a document or an email. Delete any line that doesn’t apply.
[Your company name] · [phone] · [email] · [licence / business number] · [insurance and WSIB / workers’ comp status]
Estimate # [number] · Date [date] · Valid for [30] days
Customer: [name] · Job address: [address]
Roof: [number] squares, [pitch], [layers of existing shingles], [roof type]
Scope of work: 1) Tear off [number] layer(s) of existing shingles to the deck. 2) Inspect deck; replace damaged sheathing at [$ per sheet]. 3) Install [ice and water shield at eaves and valleys]. 4) Install synthetic underlayment. 5) Install new drip edge. 6) Install [brand and colour] shingles. 7) Replace flashing at [chimney / walls / pipes]. 8) Install [ridge vent / roof vents]. 9) Clean up and magnet-sweep the property.
Price: Materials $[amount] · Labour $[amount] · Disposal $[amount] · Permit $[amount] · Subtotal $[amount] · Tax $[amount] · Total $[amount]
Not included: [rotted decking beyond the allowance, chimney rebuilds, skylight replacement, interior damage]
Payment: [deposit] on acceptance, balance on completion.
Warranty: [years] workmanship, plus the manufacturer’s shingle warranty.
Accepted by: ____________ Date: ______
That layout works because it answers the three questions a homeowner has: what exactly are you doing, what does it cost, and what happens if you find a problem. If you want a refresher on structure and wording, read how to write a contractor estimate.
Worked example: 28-square shingle re-roof
These numbers are an illustration of how to build up a price, in Canadian dollars. Replace every figure with your own supplier prices and labour costs.
| Line | Quantity | Unit price | Amount |
|---|---|---|---|
| Architectural shingles (3 bundles per square, plus 10% waste) | 31 squares | $110/square | $3,410 |
| Synthetic underlayment | 28 squares | $22/square | $616 |
| Ice and water shield (eaves and valleys) | 4 rolls | $115/roll | $460 |
| Drip edge, starter strip, ridge caps, nails, sealant | Lot | Allowance | $720 |
| Roof vents and pipe flashings | Lot | Allowance | $310 |
| Labour: tear-off and install (crew of 4, 2 days) | 28 squares | $150/square | $4,200 |
| Bin rental and disposal | 1 | Quoted | $650 |
| Decking allowance (up to 3 sheets) | 3 sheets | $95/sheet | $285 |
| Subtotal before overhead and profit | $10,651 | ||
| Overhead and profit at 25% of price | $3,550 | ||
| Price before tax | $14,201 |
In this example, the price before tax divides to about $507 per square installed. A figure like that is only useful as a sanity check against your own past jobs, not as a number to quote customers. If your overhead and profit are lower or higher, change the percentage. Our contractor markup calculator shows the difference between markup and margin, which trips up a lot of roofers. Don’t forget tax: our HST calculator adds it correctly.
Rotten decking is the classic roofing surprise. Price a small allowance (three sheets above) and state the per-sheet price for anything beyond. The customer knows the rule up front, and you aren’t eating the cost.
How to measure and count squares
Measure the roof, not the house. Add up each plane (length × slope length), divide by 100, then add waste. For a simple gable roof, waste is usually around 10%; cut-up roofs with many valleys and hips need more. Pitch changes the slope length, so don’t just use the footprint. Our roof pitch calculator and roofing calculator work out slope factors and squares so you can check your numbers.
Eaves length and run, from the ground or with aerial measurements if you use them.
A steeper roof has more surface than its footprint.
More hips, valleys and dormers means more cutting.
Layers affect tear-off time and disposal weight.
Steep roofs, no driveway or a second storey change labour time.
A full walkthrough of the process, from the inspection to the written price, is in how to write a roofing estimate.
Exclusions that protect you
The “not included” section isn’t negative. It’s how you avoid arguments. List what you’re not pricing, and explain what happens if you find it:
- Decking replacement beyond the stated allowance, at the stated per-sheet price.
- Structural repairs, rotten fascia or soffit boards discovered after tear-off.
- Chimney rebuilds, skylight replacements and eavestrough work, unless listed.
- Interior damage, attic insulation or ventilation upgrades required by code.
- Colour or product changes after the order is placed.
- Delays from weather, with the schedule adjusted instead of a penalty.
Not legal advice: have a lawyer or your insurer review your contract wording, and check your provincial or state licensing and warranty rules.
Offer good-better-best options
One price forces a yes or no. Three options turn the question into “which one?”. For roofing, the options usually differ by shingle line, underlayment, ventilation and warranty length.
| Good | Better | Best | |
|---|---|---|---|
| Shingles | Standard architectural | Premium architectural | Designer or impact-rated |
| Underlayment | Synthetic | Synthetic + ice and water at eaves | Full ice and water shield |
| Ventilation | Existing vents | New static vents | Ridge vent system |
| Workmanship warranty | 5 years | 10 years | 15 years |
| Price | $[low] | $[middle] | $[high] |
Make the “Better” option the one you’d put on your own house. Most customers pick the middle. More on structuring tiers in how to price a contractor job.
Payment terms and deposit
Roofing involves large material orders, so deposits are normal. A common structure is a deposit on acceptance (to order materials), and the balance on completion. Some roofers take a draw at tear-off for larger jobs. Whatever you choose, put it in writing on the estimate. See how much deposit a contractor should ask for and our guide to contractor payment terms. Check your local rules on deposit limits and holdbacks before you copy anyone’s numbers.
Add photos and a short cover note
A one-page estimate with three or four photos of the actual roof beats a plain price sheet. Show the worn shingles, the damaged flashing or the sagging section you want to fix, with a caption such as “Lifted shingles at the north valley.” Photos prove you looked carefully, justify the scope, and give the customer something to show a spouse or an insurance adjuster.
Add a short cover note in your own words: what you found, what you recommend and the earliest start date. Two or three sentences is enough. Homeowners hire people they trust, and a clear, human note does more than a page of boilerplate.
Five mistakes that lose roofing jobs
- Sending it days later. The first clear, written estimate often wins. Aim for same day.
- Vague scope. “Replace roof” doesn’t tell the customer what they’re buying. List the steps.
- No waste factor. Short material orders mean emergency runs and lost margin.
- No follow-up. Most estimates that go quiet are won by whoever follows up.
- Hiding the exclusions. Surprises after tear-off cost you goodwill.
Sending it and following up
Send the estimate by text or email with a link the customer can open on a phone and sign. Then set a follow-up: a short text two days later, and again after a week. “Hi Dana, just checking you got the roof estimate. Any questions? I can hold next Thursday for your start date.” Our guide on following up without being pushy has more scripts.
Contruva’s quotes let you build this on your phone, send it with e-signature and follow up automatically, and the roofing page shows how it fits a roofing crew. There’s a 7-day free trial, no credit card. Contruva isn’t accounting software, so your accountant still handles the books.