To price a kitchen renovation, start with the scope, then price labour, materials, fixtures and subtrades line by line, add overhead and profit, and finish with allowances for the things the customer has not picked yet and a contingency for what you find behind the walls. A mid-range kitchen renovation in Canada typically costs $30,000 to $60,000, according to 2026 Canadian cost guides, and the method below is how you get from that range to a number you can stand behind.
Kitchens are the most expensive room to price, and the easiest to underprice. They carry the highest cost per square foot of any room in the house, and they touch every trade: demolition, plumbing, electrical, drywall, flooring, tile, cabinets and countertops. This guide gives you the 2026 cost ranges, the per-square-foot method, the line items, and a worked example. All prices are in Canadian dollars, before HST or GST, unless it says otherwise. This is general pricing information, not tax advice; check the CRA for how tax applies to your invoices.
What does a kitchen renovation cost in 2026?
Canadian cost guides for 2026 broadly agree on the ranges, even if the exact averages differ. HomeStars puts a kitchen renovation in Canada at $15,000 to $60,000, with a basic update at $15,000 to $30,000, a mid-range renovation at $30,000 to $60,000, and a high-end kitchen with premium finishes and layout changes above $80,000. RenoQuotes’ 2026 Canadian kitchen guide lands in similar territory: $15,000 to $25,000 basic, $30,000 to $55,000 mid-range, and $65,000 and up for high-end, with a full renovation averaging around $35,000 to $45,000 nationally.
| Scope | Typical cost in Canada, 2026 | What it includes |
|---|---|---|
| Cosmetic refresh | $15,000 – $30,000 | Refacing or painting cabinets, new counters, backsplash, hardware, lighting. Layout untouched. |
| Mid-range full renovation | $30,000 – $60,000 | New cabinets, stone counters, new appliances, tile backsplash, new flooring and lighting. |
| High-end, layout changed | $65,000 – $100,000+ | Moved plumbing and walls, custom cabinetry, professional appliances, premium stone, new flooring throughout. |
| Luxury custom kitchen | $100,000 – $150,000+ | Structural changes, custom millwork, top-tier appliances, marble or large-format stone, smart features. |
Per square foot, HomeStars puts a standard renovation at $100 to $200 a square foot and a high-end finish at $200 to $400. Kitchens and bathrooms carry the highest cost per square foot of any room, commonly $45 to $140 a square foot once cabinetry, tiling, fixtures and plumbing are counted together. Use those figures as a sanity check on your own number, not as the number itself. Your price comes from your own costs, which is what the rest of this guide builds.
Price by scope first
Before you measure anything, pin down the scope in writing with the customer. A kitchen price without a scope is a guess, and guesses are where disputes start. Walk the room together and agree on:
- Layout: same layout, or is anything moving? Moving a sink, a gas range or a wall is the single biggest cost jump in a kitchen job.
- What stays: cabinets, appliances, flooring, lighting, the sink and faucet. Everything that stays is a line you do not price.
- Cabinets: stock, semi-custom or custom, and whether the boxes stay with new doors. Cabinets are the biggest single line on most kitchen jobs.
- Countertops: laminate, quartz, granite or butcher block, and the edge profile. Stone costs more to buy, deliver and install.
- Appliances: brand and model, or an allowance. A professional range costs several times a standard one, and it changes the gas and electrical work.
- Extras: an island, a pantry wall, a pot filler, under-cabinet lighting, a wine fridge, a steam oven, heated floors.
Write it down and have the customer sign it with the estimate. If the scope changes later, it becomes a change order, not an argument. Our guide on how to handle a change order covers that process.
What drives the price up or down
Five things move a kitchen price more than anything else. Price them explicitly, or they will eat your margin quietly.
| Driver | Why it matters | Typical effect |
|---|---|---|
| Moving plumbing or gas | New drains, water lines and gas lines, often through joists or concrete | A few thousand dollars, more if the slab or a load-bearing wall is involved |
| Cabinets | The biggest single line; stock, semi-custom and custom are different jobs | HomeStars puts cabinets at $3,000 to $30,000 or more |
| Countertops | Material and fabrication, plus templating and install | HomeStars puts countertops at $20 to $155 per sq ft installed |
| Appliances | Standard to professional grade is a wide spread | HomeStars puts a full package at $8,000 to $40,000 |
| Location | Labour in Toronto and Vancouver runs well above smaller centres | HomeStars puts renovation work at $150 to $250 per sq ft in Toronto and $160 to $210 in Vancouver |
Condos add their own costs: elevator bookings, protection for common areas, restricted work hours, and board approvals. Price a condo kitchen with a site visit and a read of the building rules, not from a photo.
The pricing method, step by step
Price a kitchen the same way every time, and the number stops depending on your mood on the day you quoted it.
Measure the room, count the cabinets in linear feet, and list every scope item from demolition to the last tube of silicone.
Labour at your loaded rate, materials at supplier prices, subtrades at their quotes, permits and disposal.
A dollar figure for every appliance, fixture and finish the customer has not picked yet, with the allowance stated on the estimate.
Your overhead rate on top of direct costs. If you do not know yours, work it out from last year’s books.
A planned margin, not whatever is left over. Many contractors aim for 10% net or more.
10% for older homes, shown as its own line or built into the price.
Charge HST or GST on the full price of the job, materials and labour included, if you are registered.
The difference between markup and margin trips up a lot of contractors. Markup is a percentage of your cost; margin is a percentage of your price. A 20% markup on a $10,000 job gives you a $12,000 price and only a 16.7% margin. To hit a 20% margin you need $12,500. Our guide to pricing a contractor job walks through the difference with a worked example, and the free contractor markup calculator does the conversion both ways.
Pricing labour
Labour is usually the biggest line in a kitchen renovation after cabinets, and the easiest to underprice, because the work is fiddly and slow. A kitchen is the room where every trade is in the same space, and a lot of the work is in the details: cabinet levelling, scribe cuts, tile lines, grout and silicone.
Price labour by trade and by day, not as one lump. Get quotes from your plumber, electrician and cabinet installer for the job, and price your own crew’s time at the loaded rate, not the wage. A $35 an hour carpenter costs you more than $35 an hour once you add vacation pay, CPP and EI, workers’ comp and benefits, often 20% to 35% on top.
| Trade | Typical work on a mid-range kitchen | How to price it |
|---|---|---|
| Demolition and disposal | Remove cabinets, counters, flooring and backsplash, bin | One to two days plus bin and tipping fees |
| Plumbing | Sink and dishwasher rough-in, pot filler, gas line for the range | Subtrade quote; $75 to $150 an hour if hourly |
| Electrical | Pot lights, under-cabinet lighting, dedicated circuits, panel work | Subtrade quote; $75 to $150 an hour if hourly |
| Cabinets | Install, levelling, scribing, hardware, panels and trim | Per linear foot or per day from the installer |
| Countertops | Template, fabrication, delivery and install | Per square foot from the fabricator, plus sink cut-outs |
| Tile | Backsplash, floor if tiled, grout and silicone | Per square foot, plus a day rate for small or fiddly areas |
| Drywall and paint | Patching, new bulkheads, paint, trim | Loaded day rate from your own records |
Track your crew’s actual hours per kitchen against the estimate. After five or six jobs you will know your real production rate, and your prices will stop being guesses. If you want the method in full, contractor job costing explains how to track estimate against actual while the job runs.
Pricing materials and fixtures
Price materials from current supplier prices, not from memory and not from the last job. Cabinets, stone, appliances and lumber prices move, and a quote that is two months old can be wrong by enough to erase the margin.
| Item | What to include | Notes |
|---|---|---|
| Cabinets | Boxes, doors, drawers, hardware, panels, toe kick, crown | HomeStars puts cabinets at $3,000 to $30,000 or more; custom costs more per linear foot |
| Countertops | Slab, fabrication, templating, delivery, install, sink cut-outs | HomeStars puts countertops at $20 to $155 per sq ft installed |
| Appliances | Range, fridge, dishwasher, hood fan, microwave, panels | HomeStars puts a full package at $8,000 to $40,000 |
| Backsplash tile | Tile, adhesive, grout, trim, sealer | Add 10% to 15% waste for cuts |
| Flooring | Material, underlay, transitions, install | Match the rest of the main floor if the customer wants it to flow |
| Sink and faucet | Sink, faucet, soap dispenser, strainer, supply lines | Price the faucet and sink as one set |
| Lighting | Pot lights, under-cabinet strips, pendants, dimmers | A layered lighting plan is worth the extra money |
| Plumbing and electrical rough-in | Pipe, wire, boxes, fittings, drains, gas line | Priced from the subtrade quote |
Price materials on their pre-tax cost. If you are registered for GST/HST, you claim the tax you paid on materials back as an input tax credit, so marking up the tax-included price and then charging HST again overprices the job. See do contractors charge HST on materials for the full explanation.
Allowances, not guesses
Customers rarely pick every appliance and fixture before you quote. The answer is an allowance: a dollar figure on the estimate for each unpicked item, with a clear rule for what happens when they pick something pricier.
“Appliance allowance: $9,000 for a standard range, fridge, dishwasher and hood fan, supplied. If you choose appliances above that amount, the difference is added to the final invoice at cost, plus HST.”
Give an allowance for appliances, the faucet and sink, lighting, the backsplash tile and the countertop at minimum. State the allowance on the estimate, and state that the customer pays the difference if they go over. An allowance is not a guess; it is a budget the customer agreed to. When they pick the $1,200 faucet instead of the $300 one, nobody is surprised.
The hidden costs and contingency
Every older kitchen hides something. The question is not whether you will find it, it is whether you priced for it.
- Rotten subfloor and walls. Leaks around the sink and dishwasher rot the floor and the wall behind the cabinets. Price a per-sheet replacement rate on the estimate, with photos.
- Old wiring. Knob-and-tube, ungrounded circuits and overloaded panels show up once the walls are open. Your electrician should flag the risk on the site visit.
- Plumbing in the wrong place. Old drains and supply lines rarely sit where the new layout wants them. Budget for moving them, not just connecting to them.
- Out-of-square walls and floors. Old kitchens are rarely square, and cabinets and stone show it. Allow extra labour for levelling and scribing.
- Asbestos. In homes built before the mid-1980s, old vinyl flooring, mastic and drywall compound can contain asbestos. If you suspect it, stop and get it tested before you demolish.
A 10% contingency is standard on older Canadian homes, according to 2026 renovation guides. Show it as its own line so the customer understands what it is for, and tell them what happens to it if you do not use it: it comes off the final invoice, or it stays as a credit. Either way, agree on it before you start.
Worked example: a mid-range 10 x 12 ft kitchen
Here is a full price built the way described above. All figures are illustrative, to show the method, not market rates. Plug in your own supplier prices, crew costs and margin. The kitchen is 10 x 12 ft, same layout, semi-custom cabinets, quartz counters, a standard appliance package and a tile backsplash.
| Line item | Cost |
|---|---|
| Demolition and disposal | $1,800 |
| Cabinets, semi-custom, 20 linear feet | $12,000 |
| Quartz countertops, 45 sq ft | $4,500 |
| Appliance package, standard grade | $9,000 |
| Plumbing rough-in, sink and faucet | $2,200 |
| Electrical: pot lights, under-cabinet, circuits | $2,800 |
| Flooring, 120 sq ft | $2,000 |
| Tile backsplash | $1,400 |
| Drywall, paint and trim | $1,800 |
| Permits | $800 |
| Direct costs | $38,300 |
| Overhead at 15% of direct costs | $5,745 |
| Break-even | $44,045 |
| Profit at a 10% net margin ($44,045 ÷ 0.90) | $4,894 |
| Price before tax | $48,939 |
| Contingency at 10% (older home) | $4,894 |
| Total with contingency | $53,833 |
That lands at about $408 a square foot before tax, which sits at the top of the mid-range band because the example includes stone counters and a full appliance package. If your number lands far outside the published ranges, check your inputs before you send it: either you missed something, or you are pricing a different scope than the customer is imagining. Add the tax that applies where you work on the invoice.
Presenting the price
How you present a kitchen price matters as much as the number. A single lump sum invites a yes-or-no decision and a comparison with the cheapest quote. A clear, itemized price invites a conversation about what is included.
- Show the sections. Demolition, cabinets, counters, appliances, plumbing, electrical, tile, finishing. The customer can see where the money goes.
- Give two or three options. Good, better, best: same layout with different cabinets, counters and appliances. Plenty of customers pick the middle, and you stop competing on the cheapest number.
- State the allowances. Every unpicked item gets a dollar figure on the page.
- State the exclusions. Structural work, moving plumbing or gas, asbestos abatement, permits if not included, appliances if not supplied.
- Put an expiry on it. Thirty days is common. Material prices move, and an expiry protects you while encouraging a decision.
- Make it easy to sign. A link they can open on their phone, approve and pay a deposit on beats a PDF they have to print.
For the general template behind this, use our contractor estimate template. For bathroom numbers, see how to price a bathroom renovation, and for the quoting process, how to write a roofing estimate.
Pricing mistakes that lose money
- Pricing from memory. Supplier prices move. Check them on every quote.
- Forgetting the loaded labour rate. Costing a carpenter at the wage instead of the loaded rate quietly gives away 20% to 35%.
- No allowance rules. A customer who picks the professional range without a rule in place expects you to absorb it.
- No contingency on an old house. The subfloor is rotten more often than it is fine. Price for it.
- Marking up the tax-included price. Price materials pre-tax and charge HST on the selling price, not on top of tax you already paid.
- One lump sum, no sections. The customer cannot see what they are paying for, so they shop on price alone.
- Forgetting the follow-up. A kitchen is a big decision and most homeowners collect two or three quotes. The first clear, itemized estimate that arrives has a real advantage.
Contruva’s quoting software keeps your price book for kitchen work saved, so cabinets, a quartz countertop and a day of install labour are line items you pick, not numbers you retype. The customer signs on their phone and pays the deposit before you order materials, and follow-ups go out on schedule. See what else is included on the pricing page, or read how to write a contractor estimate that wins the job.
Sources
- HomeStars: Home Renovation Cost in Canada, 2026: Kitchen renovation ranges of $15,000 to $60,000, cabinets $3,000 to $30,000+, countertops $20 to $155 per sq ft, appliances $8,000 to $40,000.
- CRA: GST/HST for businesses: How businesses charge, remit and report GST/HST.
